The Pre-Pre Public Run Day Workday Scheduled for Saturday, September 11th at 8:30 a.m.

Now that the passenger line is complete we shift our attention to checking the rest of the railroad for any needed maintenance around the railroad and the property. Here is a list of items that we will need to work on:

  1. Track inspection and repair (not just marking but repairing) - check for gaps in rail, rail joiners, check and oil switches for operation, make sure all frog guards are free of debris, check track alignment

  2. Ant & Wasp check - treat for ants and make sure any wasp nests in common areas are removed.

  3. Property Clean up - clean up sticks, rocks, grass cutting, fence repair, and clean up anything that makes the property not look as good as it should.

  4. Breeseway - Clean up sticks, gutters, and other items around this area

  5. Gauge 1 clean up - grass cutting inside the circle area

  6. Construction material - All construction material should be picked up and put in its proper place

  7. Install fencing near new passenger station area

As a reminder our Annual Boiler inspection is scheduled for Saturday, September 18th at 8:30 a.m. Please click the link below and let us know if you are planning on having your steam engine inspected?

https://us9.list-manage.com/survey?u=22f5b9585e7729d6e90c345de&id=d51b613118&e=*|UNIQID|*

Previous
Previous

Annual Boiler Inspection is scheduled for Saturday, September 18th at 8:30 a.m.

Next
Next

Reminder about our 1st Ever North Georgia Live Steamers Fall Meet - October 21st - 24th