What an incredible day. The air warmed up, and the sun was bright throughout the day. We had an energetic crew at the site helping to repair both of the outer loop tracks on the east side of the railroad. The crew, consisting of Tyler, Paul, Dale, Robby, Brooke, Darryl, Brandon, and Robby, regauged and removed gaps between sections of more than 150 feet of track. The crew leveled and ballasted the area as well, with more still to be done. While the crew was working on the east loop, John and Norm worked on building a curve switch for the Grandma Line project. The plan is to install the switch on the mainline during our next workday on Saturday, March 8th.