Progress on the "Grandma Line" was made today during an official workday

A small crew of two went out to the site on Saturday and took advantage of the cooler weather by working on moving a retaining wall which is part of the “Grandma Line” project. John and Wes started Friday evening by picking up sixteen railroad ties and spent Saturday installing eight of them while doing groundwork along the way. More of the old rotten ties have been removed and relocated in places that still makes them useful. John reports that approximately 10 feet of backfill leveled the sub roadbed in preparation for crush & run and a preliminary track plan was laced out. They had a drain that they couldn’t figure out how to extend so they made a 3 square foot holding tank filled with gravel to hold the water until it could be absorbed into the soil. If you are interested in getting involved in this project a schedule is being put together and will be shared soon.

Previous
Previous

Come prepare the railroad on Saturday, September 30th as we prepare for our next run day

Next
Next

Come ride trains on Saturday, October 7th from 1 p.m. to 4:30 p.m.