Here are some details regarding the Grandma Line portion of the project. The details are broken out in three pieces which includes two ends and the middle. Details below.
East end:
1. Complete East end of the Waterline extension.
2. Determine new location for water access (near outer loop) and relocate same.
3. Set additional RR ties.
4. Continue backfill behind RR ties.
5. Extend East end of Grandma Line starting from the Waterline switch to a point inside the woods. (Forms/crush & run/track)
West end:
1. Make curved RH 100’ r switch
2. Install switch at marked location.
3. Fill sub roadbed from new switch to a point inside the woods. (Forms/crush & run/track)
Woods section (middle):
1. Finalize and mark route.
2. Determine pier placement (span & location).
3. Make pier forms.
4. Prep/set/pour one pier at a time.
5. Construct/install one span at a time as piers are built using current bridges as a model.
6. Install tracks & guard rails as spans are completed.