Another big day working on the passenger line project. The day consisted of grading nearly 200’, setting the man crossing, and adding more conduit under the new 60’ gate crossing. The crew, which consisted of Gene, “Bob2”, Norm, Calvin, Elijah, David E., Wes, Robby, Tyler, James, and Jaxon also spent time saying goodbye to James and Jaxon as the family moves out of the area onto a new adventure. We wish them the best and hope to see the family around a railroad in the future. The crew also visited with James and Jaxon as they prepare to move out of the area onto a new adventure and hope to see them around the hobby one day in the near future.

Check out these pictures from the day’s activities. Don’t forget if you are available on Monday, May 24th the 60’ gate crossing will get nearly 7 yards of concrete and could use all of the extra hands as possible. The plan is to arrive around 8:30 a.m. with the concrete truck arriving in the 9 o’clock hour. If all goes well, we should be done around lunch time.

Previous
Previous

Private event on Saturday, July 17th

Next
Next

Looking to the second half of 2021