Another switch built and ready for installation in preparation of the new passenger line

As preparations continue to get the railroad ready for the new passenger line installation Gene and Norm spent time today, July 21, 2020, and built another switch and delivering it to the site. Next step is to get the new switch installed and align the track. We also have another switch to pull out from the woods and realign the track to make room for the “Grandma” line installation.

Previous
Previous

First Day of Track Laying - July 24, 2010 Video

Next
Next

Here is a look at what's going on around the railroad as of today