Did someone say move the dirt? That apparently was the plan for today's activity at the railroad
A small group of club members went out to the site to move the dirt we piled up last fall and have now relocated the pile into multiple areas around the railroad property. From the looks of it we had a little extra muscle with “Bob” and “Bob Jr” helping with the heavy lifting with Ben, Gene, Scott, Wes, Susan, Norm, and some that probably didn’t make the pictures. It was a good thing the extra muscle arrived because they pulled chicken wire and fence post from around Bridge, straightened the retaining wall at ash pit line, scooped dirt at yard head (real term?) from where the dirt ran downhill from rain into the station mainline, graded yard end of retaining wall for culvert between tie wall and bridge, added gravel in culvert to help prevent washout, added extra drain tube to LaVay Bridge culvert area, spread seed and straw just in time for the rain to come tomorrow.
As you may know we are recapturing some land near the bridges so we can one day double track an area for a passenger station along with fill in some dips in the ground near the lift station which will one day be part of the passenger line path. As for the rest of the dirt only mother nature knows the real answer. Next step will be to plant grass and finish the installation of the ash pit line and grey container extension.
Keep an eye out for our next scheduled workday.